Figure9

A network flow approach for constellation planning

Figure 9. The resulting utility score and computation cost from the scenario in Figure 8 using three satellites. The left image shows the edge length vs utility for the untrimmed, naively trimmed, and backbone trimmed graphs. The middle image is a zoomed in view of the left image. The right image shows the resulting computation time for the trimming.

Space Mission Planning & Operations
ISSN Coming Soon
Follow Us