INTRODUCTION
Electricity grids are vital to electricity systems worldwide and will be even more essential as the transition to clean energy advances[1]. Meeting countries' energy and climate targets requires expanding renewable energy generation and electrification in transportation, heating and cooling systems, and hydrogen production[1,2]. According to the International Energy Agency (IEA)[1], wind and solar photovoltaic (PV) will drive more than 80% of the growth in global power capacity over the next two decades. This expansion entails upgrading transmission and distribution (T&D) grids to connect remote renewable resources[2,3], including solar PV power plants in desert areas and offshore wind turbines located far from major demand centers, such as urban and industrial zones[1].
In Brazil, the electricity grid has shown to be even more pivotal due to its continental territorial expanse[4,5] and the complexity of its huge hydro-thermo-wind electricity generation and transmission system, primarily consisting of large hydropower plants[6]. The extensive transmission grid in the country spans more than 175,000 kilometers[7], connecting regions with high electricity generation, such as the North, to the consumer centers, mainly in the Southeast[5].
As the Ten-Year Energy Expansion Plan (PDE as in its Portuguese acronym)[7] states, the Brazilian electricity generation expansion, mainly through wind and solar PV energy sources, will lead to a continuous expansion of the transmission grid in the country[8] that should surpass the 200,000-kilometer mark by 2031[7]. At the same time, while there are several technical challenges and barriers to the broader adoption of electric vehicles (EVs) in Brazil, the Energy Research Office (EPE, from its Portuguese acronym) expects that the share of EVs - which includes hybrid and plug-in hybrid vehicles - in the national fleet will increase from less than 1% today to just over 8% by 2034, totaling approximately 4 million vehicles[9]. Without a doubt, this increase in EV adoption will significantly impact electricity demand, as well as T&D grids[9,10].
When looking closer at the future of electricity systems, it is interesting to note that electricity grids will change how they operate[2]. At the same time, they will continue to rely on traditional components such as power lines, cables, transformers, and electrical substations, which are made mainly of metals like copper and iron[1,2]. Hence, understanding the role of upgrading and expanding electricity grids in developing a sustainable energy transition means deeply understanding the environmental impacts of the current electricity grids[2,3]. In this sense, life cycle-based tools are particularly appropriate as they allow for addressing sustainability issues at each stage of products' and services' life cycles. This approach offers a comprehensive view of the electricity supply chain, highlighting and avoiding the burden-shifting between life cycle stages, impact categories, processes/activities, or geographical areas[11].
From this perspective, electricity T&D have received too little attention[1-3,12-14]. While there is a growing body of scientific literature on the life cycle environmental impacts of electricity generation, few studies address electricity T&D[2,3]. This discrepancy stems from the perception that the environmental impacts of electricity grids are small since they are generally lower than those of electricity generation[3,13]. However, it is important to recognize that they can influence the environmental performance of the entire electricity supply chain and, therefore, are not negligible[3]. Consequently, reducing greenhouse gas (GHG) emissions associated with electricity T&D is crucial to supporting carbon reduction goals and achieving carbon neutrality in light of the current climate concerns[1,14].
With this in mind, Jorge et al.[13,15] conducted a comprehensive study on the Life Cycle Assessment (LCA) of electricity T&D, divided into two parts. The first part[13] focused on power lines and cables, while the second[15] addressed transformers and electrical substation equipment. In another study, Jorge and Hertwich[2] evaluated the environmental impacts of Norwegian electricity transmission using the LCA methodology. Additionally, Arvesen et al.[3] conducted an LCA on transmitting electricity through different voltage levels in Norway. Turconi et al.[12] carried out a life cycle-based study on electricity T&D in Denmark, considering the current and future electricity systems. In recent work, Chen and Ou[16] proposed an innovative methodology for estimating the carbon footprint associated with electricity transmission and transformation equipment. Simultaneously, Li et al.[14] investigated GHG emissions within the Chinese electricity T&D sector based on LCA.
These previous studies address the environmental impacts of the electricity T&D life cycle in various contexts, highlighting that these impacts, particularly those related to energy losses, are not negligible. Although the contribution of energy losses varies by country due to different factors such as the overall electricity efficiency, the electricity generation mix, and distances from the power plants to the consumption centers[13], there is currently a lack of life cycle-based studies on electricity T&D in Brazil. Therefore, important questions regarding the Brazilian electricity grid need to be answered, including estimating the environmental impacts throughout the electricity transmission life cycle, identifying the most impactful processes and components, and assessing the contribution of energy losses considering the country's electricity generation mix.
This paper is part of an ongoing research and development (R&D) initiative at the Brazilian Electric Energy Research Center (CEPEL), commissioned by a company within the Brazilian electricity sector. This project aims to develop a methodology for performing carbon footprint analyses on electricity generation and transmission in Brazil. Within this context, the present paper centers on quantifying the GHG emissions at various stages of transmitting electricity through a case study of a transmission line in Brazil referred to as the BR-TL transmission line.
Unlike previous studies, this paper specifically addresses the life cycle environmental impacts of electricity transmission within Brazil's unique context, characterized by a predominantly renewable electricity generation mix and distinct regional factors. By providing a comprehensive analysis of the carbon footprint of the BR-TL transmission line, the present study not only addresses a critical gap in the existing literature but also offers valuable insights for the future development of electricity transmission infrastructure. This aligns with national climate targets and supports global decarbonization efforts.
METHODS
Carbon footprint
Over the past two decades, various footprints have emerged within the environmental domain, each addressing specific environmental concerns. Despite their diversity, these tools share a fundamental principle: the life cycle approach. They can assess various targets, such as products, services, organizations, locations, and nations[17,18]. The carbon footprint specifically addresses climate change. In this way, it employs a metric measured in CO2 equivalent (CO2eq.), which captures GHG emissions throughout a product or service's value chain. This metric reflects the amount of CO2 that produces an equivalent radiative forcing effect as a specific GHG[17-19].
In the context of electricity transmission, the carbon footprint encompasses the direct and indirect GHG emissions throughout the whole life cycle of the transmission lines, electrical substations, and ancillary facilities[13,15,20]. In other words, this includes GHG emissions associated with their construction, operation, and decommissioning stages. According to ISO 14067[21], a comprehensive carbon footprint analysis is conducted by implementing an LCA framework, which comprises the following steps: goal and scope definition, life cycle inventory (LCI) analysis, life cycle impact assessment (LCIA), and interpretation.
Anarede software
In life cycle-based analyses, energy losses during transmission lines' operation stage contribute significantly to their electricity transmission's environmental performance[2,3,12,14]. These energy losses are influenced by various factors, including the technology and efficiency of the equipment used in the electricity transmission system, the distances from the power plants to the electricity consumption centers, and the electric current passing through the transmission line[1,13,15]. Given the size and complexity of the Brazilian Interconnected System (SIN as in its Portuguese acronym), it is essential to develop an operating scenario for analyzing the electricity transmission systems throughout their useful life, considering their energy flows and losses, as well as the electricity delivered during their operation.
In this context, the Analysis of Electrical Power Systems in Steady State (ANAREDE)[22] software is particularly interesting and widely used in Brazil. Developed by CEPEL, ANAREDE encompasses a suite of computational applications designed to analyze electricity systems. In addition to power flow, this software has modules for network equivalent, contingency analysis, voltage and flow sensitivity analyses, continuous power flow, analysis of recomposition corridors, automatic transmission margin calculation, and static security assessment. ANAREDE's capabilities are regularly updated to meet the requirements of simulating the SIN. The analysis of the ANAREDE's outcomes provides a clear accounting of energy losses and energy delivered based on the operational time of the electricity transmission system in each static operating scenario considered for the SIN. In this sense, a time-varying scenario must also be prepared, considering the Brazilian characteristics concerning the seasonal variations in both electricity demand and supply[22].
Case study
BR-TL presentation
BR-TL is a 230 kV transmission line located in the central-west region of Brazil. This AC transmission line has operated since 1984 and uses overhead cables supported by 307 delta-type transmission towers to transmit electricity between two electrical substations approximately 112 km away, following a grid-grid pattern. Substation 01 (S01) is a step-up electrical substation with 200 MVAr, while Substation 02 (S02) is a step-down electrical substation with 650 MVAr. Therefore, the electricity transmission system under study encompasses the BR-TL transmission line and the S01 and S02 substations.
For the infrastructures of the electricity transmission system, the system boundary is defined from cradle to grave, including the construction, operation, and decommissioning stages. As the electrical substations also serve other transmission lines, only a portion of their infrastructure is allocated to the electricity transmission system based on their nominal reactive powers dedicated to it. Specifically, this system is associated with 0.15 (30 MVAr/200 MVAr) of the S01 infrastructure and 0.05 (30 MVAr/650 MVAr) of the S02 infrastructure. For electricity, only its transmission is considered. Figure 1 illustrates the system boundary established to calculate the carbon footprint of transmitting electricity through the TL-BR transmission line.
The functional unit established for assessing the carbon footprint associated with electricity transmission via the BR-TL transmission line is the delivery of 1 kilowatt-hour (kWh) of electricity to the local distribution grid [see Figure 1]. Furthermore, this analysis is supported by developing an electricity transmission scenario for the system and gathering relevant data from primary and secondary sources. While the former corresponds to the BR-TL transmission line’s team and other relevant stakeholders, the latter includes the Ecoinvent 3.8 database[23], the Emisfera Platform[24], the ReCiPe 2016 method[25], and the MapBiomas[26] initiative. Note that the Ecoinvent database is well-known and widely used in life cycle-based studies. The other tools are tailored to the Brazilian context, providing a better representation of its electricity sector and environmental aspects.
Electricity transmission scenario
Estimates of energy losses during electricity transmission and energy delivered by the BR-TL transmission line were performed through ANAREDE[22]. This analysis considered the static operating scenarios of the SIN developed by EPE, which is affiliated with the Brazilian Ministry of Mines and Energy, for 2024 to 2028. For the power flow calculations, the origin was established at the substation S01, while the destination was defined as the substation S02.
The static scenarios developed by EPE consider summer and winter periods and low, medium, and high load demands of the SIN, resulting in six scenarios each year. Since it was not possible to use operating scenarios from 1984 to 2024 - the period spanning from the start of the transmission line's operation to the year of the present research - this case study relied on the behavior of the electricity transmission system within these six scenarios from 2024 to 2028. Table 1 presents the average results for each EPE scenario within this timeframe, along with the corresponding energy losses observed during the operation of the BR-TL transmission line.
In this context, to accurately assess the energy losses associated with the entire life cycle of the BR-TL transmission line, we developed a variable scenario reflecting an average day that was extrapolated across the total number of operational days over the 40-year lifespan of the electricity transmission system. This average day was derived from the load profile of a typical week in which this system operates at high load for 15 hours, medium load for 94 hours, and low load for 59 hours. The summer scenario was applied to half of the year, while the winter scenario was assigned to the remaining half.
Table 2 provides a comprehensive overview of the total hours constituting the average day utilized for each static scenario, alongside the associated energy losses and the electricity delivered to substation S02. Based on the analysis, the energy loss percentage of 1.48% was adopted for the BR-TL transmission line, resulting in 29,754,685,286 kWh of electricity delivered to substation S02 throughout its 40 years of operation.
Additionally, the electricity generation mix associated with the BR-TL transmission line was derived from an LCI defined by the Ecoinvent 3.8 database[23] for the Central-West region of Brazil, where this transmission line is situated. Table 3 details the composition of the electricity generation mix, which includes contributions from hydroelectric, thermal, and renewable sources, to provide further context for the study.
Life cycle inventory
Concerning the construction stage of the electricity transmission system analyzed, this case study focuses on land use change and the main material and energy inputs. This involves assessing the GHG emissions from vegetation suppression, as well as the upstream supply chain of building materials, including reinforced concrete, steel structures, metals, plastics, and insulating materials. It also addresses energy consumption from diesel oil and excavation activities.
The quantification of GHG emissions resulting from land use change is based on the estimated carbon content of the vegetation below and immediately next to the BR-TL transmission line that was cleared before its construction on behalf of its safe and efficient operation. This analysis assumes that the carbon stock in the biomass suppressed would be released entirely as CO2. It also employs GHG emissions factors from the Emisfera Platform[24] and geoprocessing tools within the ArcGIS PRO software, in conjunction with land cover and use data from MapBiomas[26] for 1985, to determine the BR-TL transmission line corridor area.
On the one hand, MapBiomas is an initiative with an open platform that operates collaboratively with various institutions focused on different biomes and cross-cutting themes to generate annual land cover and use mapping, with data dating back to 1985[26]. On the other hand, the Emisfera Platform is a resource employed in the Brazilian electricity sector to create the GHG emissions inventory by utilizing information from primary sources. It gathers location-specific data through direct communication with organizations and businesses[24].
Hence, the BR-TL transmission line was delineated by a 30-meter-wide corridor between the S01 and S02 substations, resulting in an area of 336.36 ha. Since the land cover and use data used in this study are from 1985, the year following the operational initiation of the BR-TL transmission line, the vegetation coverage within its corridor was estimated based on the land cover and use surrounding it. In this sense, a 60-meter buffer was established, corresponding to a 120-meter-wide corridor along the BR-TL transmission line. This broader corridor was selected to enhance sampling efficacy, given that the MapBiomas data are provided at a scale of 1:100,000[26]. Table 4 shows the land cover and use area for the 336.36 ha of the BR-TL transmission line corridor, highlighting the primary vegetation coverage and additional categories.
Owing to the absence of data from primary sources concerning other processes during the construction stage, their elementary flows were estimated by adapting LCIs from existing electricity transmission lines in the Ecoinvent 3.8 database[23]. First, we selected the data that best represented the quantities and specifications of the main equipment used in the transmission line and the S01 and S02 substations. Subsequently, we used the voltage levels of transmission lines and transformers at these substations as parameters for the LCI adaptations [Table 5 and Table 6]. For transportation throughout all life cycle stages, this case study incorporated transport activities that considered relevant suppliers within the region and country for the foreground processes. Conversely, for the background processes, it employed data from the Ecoinvent 3.8 database[23] for the LCIs used in the electricity transmission system being studied.
Regarding the operation stage, this case study considers transportation activities for facility maintenance and energy losses during electricity transmission (see the Electricity transmission scenario item). Transportation activities include using a helicopter for annual inspections, which would require four minutes of flight time per kilometer, and for ten-yearly inspections, which would take eight minutes of flight time per kilometer[3]. The outputs generated during the operating stage include nitrous oxide (N2O) formation, resulting from air ionization surrounding the transmission line conductors in a high electric field[23] [Table 7].
Our analysis also encompasses the main material inputs of the S01 and S02 substations, such as lubricating oil and sulfur hexafluoride (SF6) insulating gas, diesel oil consumption, and energy losses in the transformers. Note that the operational technical team from these electrical substations provided information on lubricating and diesel oil consumption. In contrast, information regarding SF6 insulating gas was obtained from the Ecoinvent 3.8 database[23]. Furthermore, the operational technical team at the S01 substation reported energy losses in the transformers at a rate of 1%. In the absence of primary data for energy losses associated with substation S02, the same 1% energy loss rate was adopted for its transformers. Concerning the outputs of the operation stage of the S01 and S02 substations, this case study specifically addresses the management of lubricating oil waste, the fugitive emissions of SF6, and CO2 emissions associated with diesel fuel combustion [Table 8].
The decommissioning stage of the BR-TL transmission line and the S01 and S02 substations includes the end-of-life scenarios for their primary components and materials without considering the reuse of any equipment. On the one hand, an end-of-life recycling scenario was assumed for aluminum, electronic materials, copper, and reinforced concrete waste. On the other hand, the polyvinyl chloride (PVC) waste was designated for incineration. It is worth noting that the transportation activities of this stage correspond to the hypotheses adopted in the LCIs for treating these wastes available in the Ecoinvent 3.8 database[23].
RESULTS
Life cycle impact assessment
This section comprehensively analyzes the carbon footprint associated with electricity transmission through the BR-TL transmission line based on GHG emission factors from the Emisfera Platform[24] and the ReCiPe 2016 method[25]. The latter is a recent and widely used LCIA method whose global warming impact category is based on the Intergovernmental Panel on Climate Change (IPCC)[27]. It harmonizes modeling principles and choices, providing results at both midpoint and endpoint levels[25].
Over an estimated operational lifespan of 40 years, this electricity transmission generates 315,885.00 tCO2eq., corresponding to 10.89 gCO2eq. per kWh delivered. During the construction stage, the carbon footprint was measured at 3.54 gCO2eq./kWh. As for the operation stage, the electricity transmission through the BR-TL transmission line is linked with 7.34 gCO2eq./kWh. In the decommissioning stage, an estimated 0.01 gCO2eq./kWh is emitted. Table 9 provides a breakdown of these results by the life cycle stage of the transmission facilities, highlighting the main contributors.
CONCLUSIONS
This paper addressed the carbon footprint of electricity transmission by quantifying the GHG emissions at various stages of transmitting electricity through a case study in Brazil. For this purpose, our analysis focused on an electricity transmission system composed of the BR-TL transmission line and the S01 and S02 substations. In this context, a comprehensive electricity transmission scenario was developed for this system utilizing the ANAREDE software. Our analysis also incorporated detailed data on land use and relevant inputs and outputs related to the construction, operation, and decommissioning stages throughout the life cycle of the electricity transmission system.
The carbon footprint analysis revealed that transmitting electricity through the BR-TL transmission line results in 10.89 gCO2eq. per kWh delivered. Our findings indicated that the operation stage is responsible for over 67% of these GHG emissions, predominantly due to energy losses during electricity transmission and those associated with the S01 and S02 transformers. They also highlighted the relevance of the construction stage, contributing more than 32% of the carbon footprint, which is mainly linked to GHG emissions resulting from land use change.
The sensitivity analyses conducted in this study provided valuable insights into the factors that significantly influence the carbon footprint of electricity transmission. By examining two scenarios for the Brazilian electricity mix, we found that the carbon footprint of transmitting electricity via the BR-TL transmission line is highly sensitive to the electricity generation mix's GHG emissions profile. In a low-emission scenario, the carbon footprint decreased by 16%, while in a high-emission scenario, it increased by 20% compared to the Baseline. This finding highlights the importance of decarbonizing electricity generation to minimize the environmental impact of electricity T&D grids. Additionally, the sensitivity analysis of land use change demonstrated its significant effect on the carbon footprint. In a scenario where the corridor of the BR-TL transmission line would originally be covered solely by dense vegetation, the carbon footprint of its electricity transmission rose by 20% compared to the Baseline, driven by a 70% rise in GHG emissions due to land use change. This underscores the critical need to consider land use change in environmental assessments of electricity transmission projects, especially in regions with extensive forest coverage, such as Brazil.
Finally, this paper offered valuable insights for sustainable electricity transmission infrastructure development, aligning with national climate targets and supporting global decarbonization efforts. Future studies could focus on gathering more detailed primary data from the BR-TL transmission line and the S01 and S02 substations. These data should include information about building materials, equipment, maintenance activities, and energy losses in substations. Additionally, exploring more advanced equipment and innovative technologies - particularly those related to energy losses and fugitive emissions in electrical substations - would be highly beneficial. These efforts would lead to a more accurate understanding of the carbon footprint associated with electricity transmission.
Adopting a more dynamic modeling approach that encompasses the entire 40-year lifespan of the BR-TL transmission line is also recommended. This modeling could incorporate projections for changes in the electricity mix, technological advancements, and shifts in energy demand patterns. Furthermore, expanding the analysis to consider the impact of EV adoption on electricity T&D grids in Brazil, as well as addressing other environmental concerns such as water footprint and land use, would provide a more comprehensive and updated understanding of the sustainability of electricity transmission systems in the country.
DECLARATIONS
Acknowledgments
The authors gratefully acknowledge the support of the Brazilian Electric Energy Research Center (CEPEL).
Authors’ contributions
Conceptualization: Matos, D.; Garcia, K. C.
Methodology, investigation, and formal analysis: Matos, D.; Lassio, J. G.; Raupp, I.; Medeiros, A. M.; Abreu, J. L. S.; Guimarães, A. P. C.
Validation: Matos, D.; Garcia, K. C.
Writing - review and editing: Matos, D.; Garcia, K. C.; Lassio, J. G.
Software, writing - original draft preparation, and visualization: Lassio, J. G.
Project administration and supervision: Matos, D.
Availability of data and materials
The data presented in this work are available from the corresponding author upon reasonable request.
Financial support and sponsorship
None.
Conflicts of interest
All authors declared that there are no conflicts of interest.
Ethical approval and consent to participate
Not applicable.
Consent for publication
Not applicable.
Copyright
© The Author(s) 2025.
Comments
Comments must be written in English. Spam, offensive content, impersonation, and private information will not be permitted. If any comment is reported and identified as inappropriate content by OAE staff, the comment will be removed without notice. If you have any queries or need any help, please contact us at support@oaepublish.com.