fig1
Figure 1. Building infrastructure: (A) the building, (B) the interactive console, and (C) an electrical board with PLCs. PLCs: Programmable logic controllers.
Figure 1. Building infrastructure: (A) the building, (B) the interactive console, and (C) an electrical board with PLCs. PLCs: Programmable logic controllers.
All published articles are preserved here permanently:
https://www.portico.org/publishers/oae/